No posts.
No posts.

LESSON PLAN MAY - JUNE

Date / Day 25 May 2009 / Monday
Class 5K7 / 4S4
Time 0705 - 0815 / 1055 - 1130
Subject Mathematics
Activity 1. Return the answer sheet to the students.
2. Give the correct answer to the students.
3. Discuss each of the question with the students.
Noble Value Responsible, Cooperative
ABM Mathematics Paper 1 [Semester1 Examination]
Reflection 5K7 - Able to discuss Q1 - Q20 with the students
4S4  - Able to discuss Q1 - Q15 with the students.


Tarikh / Hari 25 Mei 2009 / Isnin
Kelas 6RK3
Masa 0945 - 1020
Subjek Pengajian Am
Topik C : Kefahaman dan Ulasan Teks
Subtopik 1 : Kefahaman dan Ulasan Teks Laras Sastera
Activiti 1. Memberikan satu contoh ulasan teks laras sastera.
2. Menerangkan langkah-langkah menjawab soalannya.
3. Memberikan satu soalan latihan.
Nilai Tanggungjawab, Kerjasama
ABM Pengajian Am [Penerbit Ilmu Bakti Sdn. Bhd.]
Refleksi Semua pelajar tidak dapat menyiapkan tugasan tersebut di dalam kelas maka mereka diminta meyniapkannya sebagai kerja rumah.


Tarikh / Hari 26 Mei 2009 / Selasa
Kelas 6RK3
Masa 0705 - 0815
Subjek Pangajian Am
Topik C : Kefahaman dan Ulasan Teks
Subtopik 1 : Kefahaman dan Ulasan Teks Laras Sastera
Aktiviti 1. Memberikan satu contoh ulasan teks laras sastera.
2. Menerangkan langkah-langkah menjawab soalannya.
3. Memberikan satu soalan latihan.
Nilai Tanggungjawab, Kerjasama
ABM Pengajian Am {Penerbit Ilmu Bakti Sdn. Bhd.]
Refleksi Sebilangan pelajar dapat menyiapkan tugasan di dalam kelas sementara yang belum siap diminta untuk menyiapkannya sebagai kerja rumah.


Date / Day 26 May 2009 / Tuesday
Class 5K7 /5K3
Time 0945 - 1020 / 1130 -1240
Subject Mathematics
Activity 1. Discuss the correct answer with the students
2. Allow the students to do corrections.
Noble Value Responsible, Cooperation
ABM Mathematics Paper 1 [Semester 1 Examination]
Reflection 5K7 - Able to discuss Q21 - Q30 with the students.
5K3 - Able to discuss Q21 - Q40 with the students.


Date / Day 27 May 2009 / Wednesday
Class 4S4 / 5K7
Time 0945 - 1055 / 1130 - 1240
Subject Mathematics
Activity 1. Discuss the correct answer with the students.
2. Allow the students to do corrections.
Noble Value Responsible, Cooperation
ABM Mathematics Paper 1 [Semster 1 Examination]
Reflection 4S4  - Able to discuss Q16 - Q40 with the students.
5K7 - Able to discuss Q31 - Q40 with the students.


Tarikh / Hari 28 Mei 2009 / Khamis
Kelas 6RK3
Masa 0815 - 0925
Subjek Pengajian Am
Topik C : Kefahaman dan Ulasan Teks
Subtopik 2. Kefahaman dan Ulasan Teks Laras Sains
Aktiviti 1. Memberikan satu contoh ulasan teks laras sains.
2. Menerangkan langkah-langkah menjawab soalannya.
3. Memberikan dua soalan latihan.
Nilai Tanggungjawab, Kerjasama
ABM Pengajian Am [ Penerbit Ilmu Bakti Sdn. Bhd.]
Refleksi Sebilangan pelajar tidak dapat menyiapkan tugasan tersebut di dalam kelas maka mereka diminta membuatnya sebagai kerja rumah.


Date / Day 28 May 2009 / Thursday
Class 4S4 / 5K3
Time 0945 - 1055 / 1205 - 1240
Subject Mathematics
Note No Teaching and Learning Process because all students are allowed to go back after recess.


Date / Day 29 May 2009 / Friday
Class 5K3 / 5K7
Time 0705 -0815  / 0815 - 0925
Note No Teaching & Learning Process because today is a Prize Giving Day


                              WEEK  TWENTY - FIVE  : 15 - 20 JUNE 2009 


Date / Day 15 June 2009 / Monday
Time 0705 - 0815
Subject Mathematics
L. Activity 1. Return Question Paper to the students.
2. Discuss the solution for question No. 1, 8, 9 and 10.
Noble Value Responsible, Cooperation
ABM Mathematics Paper 2
Reflection Most of the students able to solve another question similar to questions No. 1, 8, 9 and 10.


Tarikh / Hari 15 Jun 2009 / Isnin
Kelas 6RK3
Masa 0945 - 1020
Subjek Pengajian Am
Topik D : Mengalih Bentuk Teks Linear Kepada Teks Bukan Linear
Subtopik Graf Bar
1. Graf Bar Mudah
Aktiviti 1. Memberikan satu soalan latihan kepada pelajar.
2. Membenarkan pelajar melukis graf bar mudah di dalam kelas.
3. Membimbing pelajar melukis graf bar mudah.
Nilai Tanggungjawab, Kerjasama
ABM Pengajian Am [EASTVIEW]
Refleksi Graf Bar Mudah berjaya dilukis oleh semua pelajar sebelum tamat P & P.


Date / Day 15 June 2009 / Monday
Class 4S4
Time 1055 - 1130
Subject Mathematics
L. Area 6.0 : Statistics II
L. Objective 6.1 : Upper Boundary and Class Interval
6.2 : Modal Class
6.3 : Midpoint
6.4 : Mean
L. Outcome Students will be able to
  i : state the upper boundary and modal class
 ii : find the midpoint
iii : calculate the estimated mean
L. Activity 1. Explain one example to the students.
      Class           Frequency(f)        Midpoint (x)            fx    
      30 - 34                2                       32                     64
      35 - 39                6                       37                   222
      40 - 44               12                      42                   504
      45 - 49                5                       47                   235
 
      Lower Limid : 30
      Upper Limid : 34
      Lower Boundary : 29.5
      Upper Boundary : 34.5
      Midpoint : [30 + 34]/2 = 32
      Modal Class : 40 - 44 [ highest frequency ]
      Size of the class interval : 39.5 - 34.5 = 5
      Mean : [1025 / 25] = 41
2. Give exercises to the students to solve.
3. Guide them in solving solving the questions.
4. Discuss the solution for each of the question.
Noble Value Responsible, Cooperation
ABM Strategic Practice Mathematics F4
Reflection Most of the students able to solve question on upper boundary and class interval, modal class, midpoint and mean.


Tarikh / Hari 16 Jun 2009 / Selasa
Kelas 6RK3
Masa 0705 - 0815
Subjek Pengajian Am
Topik D : Mengalih Bentuk Teks Linear Kepada Teks Bukan Linear
Subtopik Graf Bar
2. Graf Bar Komponen
Aktiviti 1. Memberikan satu soalan latihan kepada pelajar.
2. Membenarkan pelajar melukis graf bar komponen di dalam kelas.
3. Membimbing pelajar melukis graf bar komponen.
Nilai Tanggungjawab, Kerjasama
ABM Pengajian Am [EASTWIEW]
Refleksi Graf Bar Komponen berjaya dilukis oleh semua pelajar sebelum tamat P & P. Sebagai tugasan tambahan, pelajar diminta melukis graf bar kompaun dengan jadual diberikan.


Date / Day 16 Jun 2009 / Tuesday
Class  5K7
Time 0945 - 1055
Subject Mathematics
L. Area 10 : Plan and Elevation
L. Objective 10.1 : Plan
10.2 : Elevation
L. Outcome Students will be able to draw plan and elevation in full scale.
L. Activity 1. Explain one example on plan and elevation to the students.
2. Give one exercise to the students to solve.
3. Guide the students in solving the question given.
Noble Value Responsible, Cooperation
ABM Actual SPM question [SPM 2006 : P2 Section B Q15].
Reflection Most of the students able to draw the plan in full scale and some of the students still need the teacher's guidance to draw the elevation.

 
Date / Day 16 June 2009 / Tuesday
Class 5K3
Time 1130 - 1240
Subject Mathematics
L. Area 8.0 : Bearing
L. Objective 8.1 : Bearing A from B and vice versa.
L. Outcome Students will be able to find the bearing of a point from another point.
L. Activity 1. Give one example to the students.
    Example : Bearing A from B - measured from true north
                                                - measured at point B
                                                - written in 3 digits
2. Give exercises on bearing to the students to solve.
3. Guide them in solving the questions given.
4. Discuss the solution for each of the question.
Noble Value Responsible, Cooperation
ABM Strategic Practice Mathematics F5
Reflection Most of the studets able to solve all the questions given in the class.


Date / Day 17 June 2009 / Wednesday
Class 4S4
Time 0945 - 1020
Subject Mathematics
L. Area 6.0 : Statistics II
L. Objective 6.5 : Frequency Table
6.6 : Histogram
L. Outcome Students will be able to complete the frequency and draw a histogram base on the data given.
L. Activity 1. Explain one example on completing the frequency table.
2. Explain how to draw the histogram base on the data given.
3. Give exercises on frequency table and histogram.
4. Guide them in solving the questions given.
5. Discuss the solution with the students.
Noble Value Responsible, Cooperation
ABM Strategic Practice Mathematics F4
Reflection


Date / Day 17 June 2009 / Wednesday
Class 5K7
Time 1130 - 1240
Subject Mathematics
L. Area 10.0 : Plan and Elevation
L. Objective 10.1 : Plan
10.2 : Elevation
L. Outcome Students will be able to draw plan and elevation in full scale.
L. Activity 1. Explain one example on plan and elevation to the students.
2. Give one exercise to the students to solve.
3. Guide the students in solving the question given.
Noble Value Responsible, Cooperation
ABM Actual SPM question [SPM 2007 : P2 Section B Q15]
Reflection


Tarikh / Hari 18 Jun 2009 / Khamis
Kelas 6RK3
Masa 0815 - 0925
Subjek Pengajian Am
Topik D : Mengalih Bentuk Teks Linear Kepada Teks Bukan Linear
Subtopik Graf Bar
4 : Graf Bar Bertindan Penuh
Aktiviti 1. Memberikan satu soalan latihan kepada pelajar.
2. Membenarkan pelajar melukis graf bar bertindan penuh di dalam
    kelas.
3. Membimbing pelajar melukis graf bar komponen.
Nilai Tanggungjawab, Kerjassama
ABM Pengajian Am [EASTVIEW]
Refleksi


Date / Day 18 June 2009 / Thursday
Class 4S4
Time 0945 - 1055
Subject Mathematics
L. Area 6.0 : Statistics II
L. Objective 6.7 : Frequency Polygon
L. Outcome Students will be able to
 i : complete the frequency table
ii : draw  the frequency polygon based on the data given.
L. Activity 1. Explain one example on completing the frequency table.
2. Explain how to draw the frequency polygon base on the data
    given.
3. Give exercises on frequency table and histogram.
4. Guide them in solving the questions given.
5. Discuss the solution with the students.
Noble Value Responsible, Cooperation
ABM Strategic Practice Mathematics F4
Reflection


Date / Day 18 June 2009 / Thursday
Class 5K3
Time 1205 -1240
Subject Mathematics
L. Area 10. 0 : Plan and Elevation
L. Objective 10.1 : Plan
10.2 : Elevation
L. Outcome Students will be able to draw plan and elevation in full scale.
L. Activity 1. Explain one example on plan and elevation to the students.
2. Give one exercise to the students to solve.
3. Guide the students in solving the question given.
Noble Value Responsible, Cooperation
ABM Actual SPM question [SPM 2006 : P2 Section B Q15]
Reflection


Date / Day 19 June 2009 / Friday
Class 5K3
Time 0705 - 0815
Subject Mathematics
L. Area 10.0 : Plan and Elevation
L. Objective 10.1 : Plan
10.2 : Elevation
L. Outcome Studenta will be able to draw a plan and an elevation in full scale.
L. Activity 1. Explain one example on plan and elevation to the students.
2. Give one exercise to the students to solve.
3. Guide the students in solving the question given.
Noble Value Responsible, Cooperation
ABM Actual SPM question [SPM 2007 : P2 Section B Q15]
Reflection


Date / Day 19 June 2009 / Friday
Class 5K7
Time 0815 - 0925
Subject Mathematics
L. Area 10.0 : Plan and Elevation
L. Objective 10.1 : Plan
10.2 : Elevation
L. Outcome Students will be able to draw a plan and an elevation in full scale.
L.Activity 1. Explain one example on plan and elevation to the students.
2. Give one exercise to the students to solve.
3. Guide the students in solving the question given.
Noble Value Responsible, Cooperation
ABM Actual SPM question [SPM 2008 : P2 Section B Q15]
Reflection


Date / Day 20 June 2009 / Saturday [Monday's Time Table]
Class 5K7
Time 0705 - 0815
Subject Mathematics
L. Area 10.0 : Plan and Elevation
L. Objective 10.1 : Plan
10.2 : Elevation
L. Outcome Students will be able to draw a plan and an elevation in full scale.
L. Activity 1. Explain one example on plan and elevation to the students.
2. Give one exercise to the students to solve.
3. Guide the students in solving the question given.
Noble Value Responsible, Cooperation
ABM Strategic Practice Mathematics F5
Reflection


Tarikh / Hari 20 Jun 2009 / Sabtu [ Jadual Waktu Isnin]
Kelas 6RK3
Masa 0945 - 1020
Subjek Pengajian Am
Topik D : Mengalih Bentuk Teks Linear Kepada Teks Bukan Linear
Subtopik Graf Bar
5 : Graf Bar Separa bertindan
Aktiviti 1. Memberikan satu soalan latihan kepada pelajar.
2. Membenarkan pelajar melukis graf bar separa bertindan di dalam
    kelas.
3. Membimbing pelajar melukis graf bar komponen.
iNilai  Tanggungjawab, Kerjasama
ABM Pengajian Am [EASTVIEW]
Refleksi


Date / Day 20 June 2009 / Saturday [ Monday's Time Table]
Class 4S4
Time 1055 - 1130
Subject Mathematics
L. Area 6.0 : Statistics II
L. Objective 6.8 ; Ogive ( Cumulative frequency curve)
L. Outcome Students will be able to
i : determine the cumulative frequency for each the table given.
ii : complete the cumulative frequency table.
iii : draw an ogive base on the data.
L. Activity 1. Explain example on completing the cumulative frequency table.
2. Explain how to draw an ogive base on the data given.
3. Give exercises on cumulativ frequency table and ogive
4. Guide them in solving the questions given.
5. Discuss the solution with the students.
Noble Value Responsible, Cooperation
ABM Strategic Practice Mathematics F4
Reflection